Access the Full Project by Clicking here!
Bidjugde
JOB
Val Vista Underdrain Improvements
BID DATE
05/11/22 - 2:00
AGENCY
Pleasanton
ESTIMATE
$1,380,000
SCOPE
The work will consist of, but is not limited to; providing and installing approximately 610 linear feet of new 8-inch fusible HDPE gravity recycled water pipe by horizontal directional drill operations, 900 linear feet of new 8-inch gravity recycled water pipe by open trench, 14 new manhole structures, two recycled water package pump stations with electrical and process instrumentation systems, 630 linear feet of new 2-1/2-inch PVC recycled water force mains by open trench, on- and off-site rehabilitation of approximately 580 linear feet of existing 18-inch to 48-inch CMP storm drain pipe using Cured-In-Place Pipe (CIPP) liner, and grout repair of two 21-inch CMP storm drain concrete outfalls in accordance with the Alameda County Flood Control and Water Conservation District Zone 7 encroachment permit, various related appurtenances, including traffic control, potholing operations, providing and implementing water pollution control measures, and landscape and site restoration for the Val Vista Park soccer field underdrain system. ssaklaen@cityofpleasantonca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT