Old Tucson Road Pavement Replacement
BID DATE
05/25/22 - 3:00
AGENCY
Nogales
ESTIMATE
n/a
SCOPE
This project consists in the replacement of the exisitng pavement on a segment of Old Tucson Road approximately 1850 feet south of north City Limits. The proposed pavement cross-section is 28 feet wide with a layout of 7-inch asphalt concrete over 18” aggregate base course. The estimated asphalt pavement replacement area is 52,010 SF (5,778 SY). This project includes improvements of road shoulders with a layer of 10-inch thick 95% compacted AC Millings obtained from the existing asphalt layer (8 feet to the west side and 5 feet to the east side). This project will also include the adjustement of two existing manhole covers and the striping of the road per striping plans. jguerra@nogalesaz.gov