JOB
Pipeline Replacement Paradise Road Twain Avenue Karen Avenue
BID DATE
06/7/22 - 11:00
AGENCY
Las Vegas VWD
ESTIMATE
$8,262,831
SCOPE
Pipeline Segment 1 consists of abandoning approximately 3,020 and 1,400 linear feet of 24- and20-inch Asbestos Cement Pipe (ACP), respectively, and replacing it with approximately 450 linear feet of 16-inch diameter ductile iron pipe (DIP) and approximately 3,900 linear feet of 24-inchdiameter DIP waterline. Segment 1 begins at a connection point to the existing 24-inch ACP north of the Sands Avenue/Twain Avenue and Paradise Road intersection and extends north approximately 4,320 linear feet. The new pipeline will connect to a stub on the existing 16” pipe line approximately 130 feet north of the Convention Center Drive and Paradise Road Intersection. The new Segment 1 pipeline will be constructed using open cut and trenchless methods and utilize settlement monitoring where indicated. In addition, approximately 1,200 linear feet of 12-inchtemporary above ground DIP will need to be constructed in order to remove and replace the existing 24-inch ACP waterline line in its current location. The existing 24-inch waterline provides supplemental service to the north portion of the Las Vegas strip and cannot be shut down for anextended period of time; construction of this segment of pipe will require temporary above ground bypass piping operations. Segment 1 pipeline will be constructed in two phases. Phase 1 will be constructed during the temporary above ground bypass operations and connected to the existing24” ACP pipe and will be operational while Phase 2 is constructed. Once Phase 2 is constructed and connected to Phase 1, the existing 24” ACP will be disconnected and abandoned in place. Purchasing.HelpDesk@lvvwd.com
PREBID
5/18/2022 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT