Access the Full Project by Clicking here!
Bidjugde
JOB
City Wide Bus Stop Improvements
BID DATE
10/2/14 - 2:00
AGENCY
Fontana
ESTIMATE
$80,000
SCOPE
The general items of work to be done hereunder will be at the Engineer’s Direction and shall consist of Removal of existing landscaping or excavation of existing soils, rerouting of existing landscape irrigation lines (if in the way), placement of concrete, traffic control and SWPPP and other work as directed by the Engineer to accommodate field conditions. Sid Lambert - 909-350-7678 slambert@fontana.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT