Access the Full Project by Clicking here!
Bidjugde
JOB
2022 Blue Point Road Repaving
BID DATE
05/20/22 - 12:00
AGENCY
Clear Lake Shores
ESTIMATE
n/a
SCOPE
Resurfacing via Full Depth Reclamation (FDR) of Blue Point Rd. approximately 16 feet wide and 675 feet long, reclaimed to a depth of eight (8) inches. Approximately 10,800 sq ft of surface area. Contractor should confirm work area calculations prior to bidding as width varies slightly. Full Depth Reclamation (FDR) Process should include at a minimum: Grind up existing old asphalt and base to depth of 8” inches and remove excess material as needed. Mix four (4) pounds of Portland cement per sq. ft. on the ground and mix into 8” inch base layer. Regrade, compact and wet down new base. (A soluble solution may be used if it meets the same stabilization design criteria.) Apply SS1 tack coat to new stabilized base. Using a paver, install 2” inches of compacted type D hot mix asphalt and compact with steel wheel roller. Elevation of the repaved roadway shall be the same as pre-construction roadway. See City design details regarding typical street profiles. City of Clear Lake Shores is soliciting sealed proposals to repave Blue Point Road . kharrell@clearlakeshores-tx.gov https://www.clearlakeshores-tx.gov/bids.aspx?bidID=6

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT