Access the Full Project by Clicking here!
Bidjugde
JOB
Ramona Pipeline Cathodic Protection
BID DATE
10/3/14 - 2:00
AGENCY
San Diego County Water Authority
ESTIMATE
$380,000
SCOPE
The work includes but is not limited to removing an existing 20 foot section of 36-inch diameter concrete bar-wrapped cylinder pipe of Ramona Pipeline and replacing with a steel pipe section with an outlet. Furnish and install piping and appurtenances for a pump well. Construct a street type precast concrete vault to house the pump well as shown on the Plans. The Work also includes furnishing all plant, tools, equipment, materials, supplies, manufactured articles, fuel, power, water, communications, all labor, transportation, and services, including design, design submittals, quality control testing and inspection, permits, bonds and insurance, taxes, and appurtenant work and materials required for the fulfillment of the work in accordance with the Contract. dmartinez@sdcwa.org
PREBID
9/16/2014 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT