San Vicente Bypass Pipeline
BID DATE
10/2/14 - 2:00
AGENCY
San Diego County Water Authority
ESTIMATE
n/a
SCOPE
The work includes but is not limited to construction of approximately 3,160 feet of 48-inch diameter reinforced concrete pipe extending from the marina area to a terminal structure located at the end of the San Vicente Tunnel of the First San Diego Aqueduct, of which approximately 2,230 feet is trench construction and approximately 930 feet is tunnel construction; appurtenant structures for the 48-inch diameter pipe, including a 69-inch diameter vent pipe, manways, and corrosion monitoring system; connection of the 48-inch diameter pipe to the existing and remaining portion of San Vicente Bypass Pipeline, and to the ends of 48-inch diameter pipe installed as part of the marina construction; replacement of the terminal structure; replacement of an access road from the marina area to the terminal structure, including storm water drainage structures; replacement of an existing 36-inch vent pipe with a manway and 12-inch vent pipe; approximately 420 feet of walking trail along the existing dirt access road to be provided with railroad tie steps; construction of a 56-foot long prefabricated pedestrian bridge, site built foundation supports, stair landings and stairs to connect walking north trail terminus to crest of San Vicente Dam; rip rap erosion protection on the reservoir shoreline; and selective demolition.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT