Access the Full Project by Clicking here!
Bidjugde
JOB
Manzanita Trail Overlay FY 21 22
BID DATE
05/12/22 - 1:30
AGENCY
Yavapai County
ESTIMATE
$628,420
SCOPE
The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for a 2” fiber reinforced asphaltic concrete overlay on Manzanita Trail from Prescott Country Club Boulevard to Turquoise Circle. The total project length is 5,835 feet with approximately 2,523 tons of fiber reinforced asphaltic concrete pavement, ½” high traffic with PG 64-22 binder. Other associated work includes: application of 3,088 gallon of bituminous tack coat; 556 square yards pavement removal and replacement with geogrid; 11,536 linear feet of shoulder build-up and grading; placement of 400 tons shoulder material; adjusting 33 water valve box frames and 1 manhole frame; re-establish pavement marking. All work is to be done in accordance with the plans, specifications, and contract documents.
PREBID
5/3/2022 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT