Access the Full Project by Clicking here!
Bidjugde
JOB
Eastmark No 1 2 Phase XX Roadway Traffic Signal Waterline Improvements
BID DATE
05/19/22 - 1:00 LIVE!
AGENCY
Mesa
ESTIMATE
$8,000,000
SCOPE
1. Offsite Improvements Eastmark Parkway (S905) - The Project consists of approximately 3,400 linear feet of roadway improvements of Eastmark Parkway from the end of the existing improvements of Eastmark Parkway to Elliot Road. Improvements consist of catch basins, storm drain, curb and gutter, sidewalk, asphalt pavement, landscape, streetlights, traffic signal and dry utility extensions. Portions of the existing median on Elliott Road will need to be modified to accommodate for the for the turning movement for the intersection of Eastmark Parkway and Elliot Road. Approximately 3,300 linear feet of 20 inch water line with cathodic protection will connect to the existing 20 inch stubs at the north and south ends of the project limits. The Project also includes installation of traffic signal at Eastmark Parkway and Elliot Road. 2. Offsite Improvements Signal Butte Waterline (S906) – The Project consists of approximately 3,200 linear feet of waterline with cathodic protection within Signal Butte Road. Improvements consist of 30 inch, 24 inch, and 16 inch watermains and appurtenances, asphalt removal and repair. Stephanie.Gishey@MesaAZ.gov EngineeringBids@mesaaz.gov
PREBID
5/2/2022 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT