Access the Full Project by Clicking here!
Bidjugde
JOB
Doherty Drive Complete Streets
BID DATE
05/10/22 - 2:00
AGENCY
Larkspur
ESTIMATE
$1,730,000
SCOPE
The work consists generally of setup and maintenance of traffic control system and water pollution control program; sawcutting; excavation, removal and disposal of curb and gutter, asphalt concrete roadway pavement; removal of existing irrigation, trees and shrubs; raising and lowering utility covers; storm drainage improvements; construction of concrete curb ramps, sidewalk, curb and gutter; construction of retaining wall; installation of chain link fence; placement of hot mix asphalt (HMA); placement of slurry seal; removal and replacement of traffic striping and markings; installation of pavement markers; installation of object markers and signs; excavation and installation of storm drainage pipe and structures; relocation of utilities and motor control center; backfill of trenches; installation of irrigation and landscaping; cleanup of the project area; and other items of work as shown on the plans. The project is located on Doherty Drive between Magnolia Avenue and Lucky Drive in the City of Larkspur. rcho@cityoflarkspur.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT