Access the Full Project by Clicking here!
Bidjugde
JOB
Kountze Street Improvements
BID DATE
04/21/22 - 2:00
AGENCY
Kountze
ESTIMATE
$125,000
SCOPE
SCOPE OF WORK CITY OF KOUNTZE, TEXAS CDBG CONTRACT NO. 7220231 STREET IMPROVEMENTS GENERAL This contract provides for the Rehabilitation of Hill Street from Hwy 96 ROW to Hilltop Street. SPECIFIC This contract shall include all necessary labor, materials, equipment, tools, inspection, testing, and superintendence required for the complete and operable rehabilitation of the proposed project as shown on the contract plans and specifications. This contract includes, but is not limited to the following: Base Bid Items Hill Street. Contractor shall rehabilitate approximately 1785 linear feet of roadway by reshaping, grading, and compacting existing roadway material, install 4" crushed limestone or concrete, Type "D" per TxDOT Item 247, and applying 2ā€ of Type ā€œDā€ HMAC surfacing per TxDOT Item 340, including driveway and street transitions, removing and resetting mailboxes (as required) and traffic control, all in strict accordance with the plans and specifications. CONDITIONS ALONG THE ROUTES The Contractor's attention is called to various physical conditions along the routes as follows. The Contractor shall take precautions to avoid damage to power lines, foundations, guy wires, and appurtenances. The Contractor shall observe all applicable OSHA and owner requirements while working near the overhead power lines including restriction of height of equipment. During construction, the Contractor shall take the necessary precautions to avoid damaging existing utilities within the limits of the project site. SPECIAL REQUIREMENTS AND CLARIFICATIONS The Contractor shall restore the work route to its original condition or better prior to acceptance by the Owner. The Contractor shall contact the owner Mr. Tim Drake at (409) 246-3463 prior to starting any work within the project area. Any changes in quantities will be addressed by change order and will have to be approved by the Owner before any work can be done. All excess materials removed during the course of the project will have to be properly disposed of by the Contractor. https://www.civcastusa.com/project/624c3f0caef2bac55fd455ad/summary twhitehead@spi-eng.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT