Magnolia Avenue Pavement Rehab
BID DATE
05/5/22 - 2:00
AGENCY
Larkspur
ESTIMATE
n/a
SCOPE
The work generally consists of mobilization; developing, setup and maintenance of a traffic control system; developing and implementing a water pollution control program; cold planing; removing and disposing of existing pavement, concrete, aggregate base and/or native materials; placement of hot mix asphalt (HMA) and rubberized hot mix asphalt (RHMA) materials; lowering and adjusting to utility covers to finish grade; replacement of traffic striping, pavement markings and raised pavement markers; cleanup of the project area and other items of work as shown in the contract documents. http://www.ci.larkspur.ca.us/Bids.aspx?BidID=67 atan@cityoflarkspur.org https://www.ebidboard.com/public/projects/showproject.asp?mbrguid={C90B6550-006F-437C-B5E9-AC71F358084D}&projectguid={4C7860E5-4B1E-4D2A-BA74-A499D5358126}

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT