Access the Full Project by Clicking here!
Bidjugde
JOB
AC Overlay 2110
BID DATE
05/18/22 - 2:00
AGENCY
San Diego
ESTIMATE
$15,200,000
SCOPE
Work will involve furnishing all labor, materials, equipment, services, quality assurance and construction including but not limited to grinding, cold milling, hauling and disposal of the existing asphalt, concrete and fabric, installment of new pavement, excavation for pavement base repair, raising appurtenances and survey monuments to grade, sweeping, installation of curb ramps to meet ADA requirements, curb and gutter removal and replacement, sidewalk panel removal and replacement, cross gutter removal and replacement, placement of pedestrian barricades, tree trimming, root pruning, tree root relocation, installment of root barriers, tree removal, vegetation removal, replacing traffic striping/markings/markers/devices, replacing vehicle detector loops and stubs, storm drain inlet protection. https://pbsystem.planetbids.com/portal/17950/bo/bo-detail/93044 Juan E. Espindola 619-533-4491 jeespindola@sandiego.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT