Access the Full Project by Clicking here!
Bidjugde
JOB
Frontage Rd 75 E 125 E 175 E Street Reconstruction
BID DATE
04/26/22 - 2:00
AGENCY
North Salt Lake
ESTIMATE
n/a
SCOPE
The work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for milling approximately 10,000 SY of existing asphalt at 3” thick, installation of approximately 1,900 tons of new asphalt, replacement of failed street sections, installation of new collars for all water valves and manholes and repainting roadway striping; all in accordance with the Drawings and Specifications prepared by the North Salt Lake City Engineering Department. https://www.nslcity.org/bids.aspx?bidId=102 gary.kobzeff@nslcity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT