Access the Full Project by Clicking here!
Bidjugde
JOB
Marsten Avenue Storm Drain Repair
BID DATE
08/28/14 - 2:00
AGENCY
Belmont
ESTIMATE
n/a
SCOPE
The Marsten Avenue Storm Drain Project is to mitigate slope erosion adjacent to Marsten Avenue at Lori Drive. To avoid further erosion of the hillside along Marsten Avenue, Public Works Department has worked with the design consultant to prepare plans and specifications for the Marsten Avenue Storm Drain Repair Project. The mitigation is to attach a high density polyethylene pipe (HDPE) to the broken end of the existing 16‐inch diameter CMP at the headscarp, and extend the new section of HDPE pipe to a suitable tie‐in section of intact, unblocked CMP culvert. The gully will be backfilled with small size rip rap materials. The finished surface of disturbed areas will be entirely covered with filter fabric or tacked to the ground surface for erosion protection. The construction is expected to begin in early September and will take approximately 40 working days after award of a contract to the selected contractor. (650) 595-7425

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT