Bell Avenue Complete Street Rehabilitation
BID DATE
05/4/22 - 2:00
AGENCY
Sacramento
ESTIMATE
$4,163,870
SCOPE
This project consists of work along Bell Avenue, from West of Bollenbacher Avenue to Astoria Street. This project provides for, in general, widening the roadway, micro-surfacing, constructing median islands, curb, gutter, and sidewalk, curb ramps, installing new drain inlets, leads and maintenance holes, extending storm drainage system approximately 320 linear feet, adjusting water meters and valves to grade, street lighting, sidewalk and barrier replacement at bridge over Magpie Creek, traffic signals, re-striping, roadside signs as shown on the plans. https://pbsystem.planetbids.com/portal/15300/bo/bo-detail/92776#bidInformation Jose Ledesma JLedesma@cityofsacramento.org
PREBID
4/13/2022 10:00