Access the Full Project by Clicking here!
Bidjugde
JOB
Brunswick Effluent Transmission Main Repair
BID DATE
05/17/22 - 11:00
AGENCY
Carson
ESTIMATE
$468,028
SCOPE
Carson City is accepting sealed bids for all labor, materials, tools and equipment necessary for the Brunswick Effluent Transmission Main Repair Project. The project includes draining the transmission main, removing and replacing one 2-inch air/vacuum valve, four 4-inch air/vacuum valves, one 8-inch air/vacuum release valve, two 8-inch butterfly valves, four 4-inch butterfly valves, two 20-inch butterfly valves, removing and replacing six manhole tops and lids with 60” flat-top manhole with 36” access, removing and replacing up to three 8-inch butterfly valves on the blow-off assemblies, removing and replacing up to two 4-inch butterfly valves on the pig launching stations, asphalt work, and associated work. It is noted that Carson City will provide the air/vacuum valves and butterfly valves to be installed by the contractor. The project includes all common phases of construction customarily associated with this type of project. cakers@carson.org
UPDATES