Access the Full Project by Clicking here!
Bidjugde
JOB
Rabbit Creek Causeway Culvert Repair-Phase II Open Cut
BID DATE
09/3/14 - 1:30
AGENCY
Amador County
ESTIMATE
$850,000
SCOPE
The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for the installation of a 48" alternative pipe culvert to convey a gravity flow between Rabbit Creek and Lake Camanche. The existing causeway will be required to be excavated to accomplish the pipe installation. The invert of the installed pipe in Rabbit Creek will be approximately 8 feet below the existing water surface elevation of Rabbit Creek. The work area on the Lake Camanche side is dry. The complete work area will require stage construction, temporary water diversion, and dewatering to facilitate the installation of the culvert. The County anticipates a full road closure of Camanche Parkway North to facilitate construction between September 8, 2014 and November 1, 2014. Reconstruction of an engineered embankment (portion of Rabbit Creek Causeway) consisting of rock slope protection, surface drainage layers and earth material to the same lines and grades as pre-construction condition is required, in addition to other items or details not mentioned above, as required by the plans and specifications, shall be performed, placed, constructed or installed. Danielle Whitaker (209) 223-6375 dwhitaker@amadorgov.org 12200B Airport Road Jackson, CA 95642

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT