JOB
US 93 Sewer Relocation
BID DATE
04/28/22 - 11:00
AGENCY
Wickenburg
ESTIMATE
n/a
SCOPE
Construction work, in general, consists of the replacement and relocation of approximately 800 linear feet of 12-inch diameter gravity sewer line, along US-93, near Rincon Road; and other incidental work. The project generally consists of the removal of 800 linear feet of 12-inch diameter vitrified clay pipe and ductile iron pipe and replacing and relocating with new PVC 12-inch diameter sewer pipe and includes the addition of 55-feet of steel casing pipe. Additionally, the project will include the removal and replacement of up to two manholes, and up to three service lateral connections. megan@wickenburgaz.org
PREBID
4/13/2022 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT