Access the Full Project by Clicking here!
Bidjugde
JOB
Silverbell Road SIdewalk Infill Phase 2
BID DATE
04/12/22 - 3:00
AGENCY
Marana
ESTIMATE
n/a
SCOPE
The project generally consists of supplying all labor, materials, tools, and equipment necessary to construct new concrete sidewalks along the eastbound side of Silverbell Road from Carefree Way to Cortaro Road; the removal and replacement of existing concrete curb, curb and gutter, and access ramps at the Silverbell/Carefree, Silverbell/Quail Park-Wildomar, and Silverbell/Cortaro intersections; the modification of median refuges at the Silverbell/Cortaro intersection; the fabrication and installation of barricade railing; and the placement of rip-rap and decomposed granite ground cover. The scope of work also includes demolition, clearing and grubbing, excavation, grading, concrete headers, asphalt paving, signage removal and replacement, traffic control, and other miscellaneous work. Rudy Torres (520) 382-1983 rtorres@maranaaz.gov https://www.publicpurchase.com/gems/marana,az/bid/bidView?bidId=155195
PREBID
3/30/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT