Access the Full Project by Clicking here!
Bidjugde
JOB
Repair of Portland Cement Concrete Sidewalk Curb Gutter Driveway
BID DATE
07/30/14 - 2:00
AGENCY
Alameda
ESTIMATE
n/a
SCOPE
The City of Alameda is soliciting bids for Repair of Portland Cement Concrete Sidewalk, Curb, Gutter, Driveway and Minor Street Patching, Fiscal Year 2014/2015, Phase 15, No. P.W. 05-14-20. The project consists of repair or replacement of portions of sidewalk, curb, gutter, driveway and road pavement, installing temporary sidewalk, red curb painting, exposure of tree roots by air spading, and tree removal and stump grinding. Shilpa Patel at (510) 747-7930.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT