Access the Full Project by Clicking here!
Bidjugde
JOB
2020 2021 Street Overlay Reconstruction
BID DATE
04/22/22 - 3:00
AGENCY
Rialto
ESTIMATE
$9,400,000
SCOPE
The general items of work to be performed hereunder consist of traffic control; implementation and maintenance of Best Management Practices SWPPP; construction staking and monument perpetuation; removal and replacement of PCC curbs, gutters, cross-gutters, drainage inlet cover, asphalt concrete dike, continuously reinforced concrete pavement (CRCP); cement stabilized pulverized base (CSPB); full depth reclamation-cement; hot mix asphalt (HMA); rubberized hot mix asphalt (RHMA) surface course; and adjustment of surface utilities to grade. The work also includes traffic striping and pavement markings, installation of detectable warning surfaces, video image vehicle detection systems and all associated work as identified on the construction drawings. https://pbsystem.planetbids.com/portal/28159/bo/bo-detail/92153 Art Cervantes acervantes@rialtoca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT