Angleton 2021 Street Bond Package 1
BID DATE
04/12/22 - 2:00
AGENCY
Angleton
ESTIMATE
$1,700,000
SCOPE
The project generally consists of removing existing concrete pavement and replacing with approximately 8,500 SY of 7”-thick, 28’ wide concrete pavement, replacing driveways, curbs, and the installation of approximately 1,400 L.F. of 18” to 30” RCP storm sewer along Ridgecrest Street and Robinhood Lane. The project also includes 1,100 L.F. of 8” water line, 120 L.F. of sanitary sewer replacement, and all labor, equipment, materials, and incidentals required for project. https://www.civcastusa.com/project/623225a15906a1e4181f7976/summary joseph.moore@hdrinc.com