West Coalinga Multi Use Trail
BID DATE
04/5/22 - 2:00
AGENCY
Coalinga
ESTIMATE
$461,000
SCOPE
The primary scope of work includes construction of 1.38 miles of Class I multi-use trail and 0.20 miles of Class IV two-way separated bikeway along Lucille and Monterey Avenues in Coalinga, CA. The work entails construction surveying, trail excavation and grading, demolition and removal of existing concrete improvements, placement of aggregate base layer, AC pavement, and decomposed granite, construction of modular block retaining wall, installation of storm drain facilities, relocation of existing fire hydrants and street light poles, adjustment of existing utility lids, construction of concrete curb and gutter, curb ramps, valley gutter, and sidewalk, and placement of striping and signage. Info@tricityengineering.com