Access the Full Project by Clicking here!
Bidjugde
JOB
Camino Del Sol Waterline Street Improvements
BID DATE
04/8/22 - 3:00
AGENCY
Nogales
ESTIMATE
n/a
SCOPE
This project consists in the replacement of an existing 4” asbestos cement water main constructed in 1922. There is only one fire hydrant at the intersection of Camino Del Sol and Sonoita Avenue that will be replaced and two more will be installed to add more fire flow protection. The total length of the proposed new 8” PVC is 1,660 feet. All work on the proposed project will take place within Cityowned Rights-of-Way. Approximately 261 LF of the new 8” PVC water main will be installed on a City of Nogales property - Santa Cruz Assessor’s Parcel 101-32-040. This project includes 26 new polyline water services. The pavement will be reconstructed in Camino Del Sol, Sonoita Ave., Ellis Street, and SCC APN 101-32-040. The estimated pavement replacement area is 45,445 SF (5,049 SY). The proposed pavement cross section is 3” Asphalt Concrete over 4” Aggregate Base Course. An area of 10,138 SF on Camino Del Sol presents an unstable subbase that will be improved with a layer of 12” soil-cement prior to the pavement replacement. jguerra@nogalesaz.gov
PREBID
3/18/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT