Rail Trail Segment 7 Phase 2
BID DATE
04/19/22 - 2:00
AGENCY
Santa Cruz - CA
ESTIMATE
$10,000,000
SCOPE
The Project to be performed consists of construction of a paved 0.8 mile multi-use trail, located adjacent to an active rail line, the Santa Cruz Branch Line Railroad between La Barranca Park at California St and the roundabout at Pacific Ave & Beach St. The 12-foot wide bike and pedestrian trail will require storm drain improvements, excavation, drilling, retaining wall work, slope grading, fiber communication, and lighting work. Soldier Pile retaining wall work consists of four sections of wall along the length of the trail with retained height ranging from 4 feet to 19 feet with tiebacks. rvaldes@cityofsantacruz.com