Access the Full Project by Clicking here!
Bidjugde
JOB
Enchanted Hills Tank 12 West Construction
BID DATE
08/19/14 - 2:00
AGENCY
Rio Rancho
ESTIMATE
n/a
SCOPE
The City of Rio Rancho is soliciting formal bid for the construction of a new 3.0 million gallon (AWWA D100) welded steel water storage tank and ringwall, Reservoir No. 12W, to be located on the same site as an existing 2.0 MG reservoir. The work also consists of installation of new 8”, 12", 14”, 16” and 20” Waterline Pipe (Ductile Iron, 250 PSI) as appropriate for construction of overflow/drain line, reservoir supply, and reservoir discharge line for connection to existing piping. In addition, work includes a reservoir mixing system (RMS), electrical power system, an impressed current cathodic protection system, and installation of equipment necessary for operation of transmitter and connections to existing radio telemetry equipment, along with a new access road around the new reservoir, and associated site grading.
PREBID
8/1/2014 12:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT