Access the Full Project by Clicking here!
Bidjugde
JOB
Eastmark Community Phase XIX Roadway Improvements
BID DATE
04/7/22 - 1:30 LIVE!
AGENCY
Mesa
ESTIMATE
$5,500,000
SCOPE
1. Offsite Improvements E. Warner Road Phase 2 (S889) - The Project consists of approximately 3,700 linear feet of roadway improvements of the north half of E. Warner Road between Ellsworth Road and Eastmark Parkway. Improvements consist of curb and gutter, sidewalk, asphalt pavement, landscape, streetlights, and dry utility extensions. Portions of the existing median will need to be modified per Plan Revision #2. 2. Offsite Improvements Ellsworth Road (S904) – The Project consists of approximately 5,200 linear feet of roadway widening improvements of Ellsworth Road between Warner Road and Elliot Road. Improvements consist of catch basins, storm drain, curb and gutter, sidewalk, asphalt pavement, landscape, streetlights, and dry utility extensions. Portions of the existing median will need to be modified to accommodate for the access improvements required near the Mesquite Road alignment. Six-inch (6”) and twelve-inch (12”) water services will be connected to the existing 16” water main and stubbed to the development to the east of Ellsworth Road. Approximately 3,100 linear feet of sewer pipe ranging between 8”- 42” will be installed. Bypass pumping of the existing 24” sewer main in Elliott Road will be required to install the proposed sewer main at the intersection of Ellsworth and Elliot. See Exhibit J2 for Technical Specifications on Diversion of Sewage Flow and Dewatering. This Project consists of two (2) new Traffic Signal installations; (1) Ellsworth Road and Mesquite Road, 2) Ellsworth Road and Elliot Road and adding a pedestrian push button at the existing Traffic Signal at Ellsworth Road and Warner Road Stephanie.Gishey@MesaAZ.gov
UPDATES