Asilomar Blvd Stabilization
BID DATE
07/27/22 - 10:00
AGENCY
Los Angeles
ESTIMATE
n/a
SCOPE
The project will stabilize the slope using a construction method called Cement-Deep Soil Mixing. (CDSM) Work within the ROW would occur using a specialized drill rig that would mix the existing subsurface material with cement, forming 346, 4 ½’ wide by 90’ deep columns, which would strengthen the subsurface material and stabilize the slide area of the roadway. After installation of the columns the roadway would be reconstructed with approximately 30,000 SF of new 6” AC on top of 12” crushed aggregate base with 806 linear feet of new integral curb and gutter.

?? See bid package for full scope & details

? Bid package only on RAMPLA- download it here to be a planholder

?For Planholders Lists & Bid Results, visit http://eng.lacity.org/contractors michael.womack@lacity.org https://www.rampla.org/s/opportunity-details?id=0066g00003YU32o