Rehabilitate Runway 12 30 Lighting Long Beach Airport
BID DATE
03/18/22 - 10:00
AGENCY
Long Beach
ESTIMATE
n/a
SCOPE
The Work to be done consists primarily of replacement of existing runway lighting circuits (Edge, Centerline lights, PAPI and Touch Down Zone) and constant current regulators, all cables, runway lighting fixtures and transformers, touchdown zone base cans, airfield electrical vault work, ALCMS and other electrical components on Runway 12-30. Work also includes installing pavement markings and striping, Asphalt Concrete paving, and AC grinding. Bids are required for the entire Work. https://pbsystem.planetbids.com/portal/15810/bo/bo-detail/90968 sokunthea.kol@longbeach.gov
PREBID
3/1/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT