Access the Full Project by Clicking here!
Bidjugde
JOB
Civic Center Water Treatment Facility Phase 2 Pipelines Pump Stations Expansion
BID DATE
03/22/22 - 3:30
AGENCY
Malibu
ESTIMATE
n/a
SCOPE
In general, the proposed improvements consist of connections to the existing wastewater collection system and recycled water distribution system facilities, construction of new wastewater collection system and recycled water distribution system facilities and associated electrical/control equipment. The work includes wastewater pumping lift stations, electrical, instrumentation/controls, HDPE pipelines, concrete and HDPE manholes, pipe appurtenances, fiber optic conduit and cabling, sewer laterals, recycled water service laterals, trench installation, horizontal directional drill installation, bore and jack installation, and installation of pipelines inside a bridge cell. The work also includes Best Management Practices (BMP), mitigation, monitoring and reporting requirements, traffic control, dewatering, asphalt pavement, and all other appurtenant work included and as shown on the Plans and in the Contract Documents and Specifications. cityclerk@malibucity.org tspayd@malibucity.org https://www.malibucity.org/Bids.aspx?BidID=181
PREBID
3/9/2022 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT