Access the Full Project by Clicking here!
Bidjugde
JOB
2020 Street Reconstruction Package 1 Fairway Savell Drive
BID DATE
03/1/22 - 2:30
AGENCY
Baytown
ESTIMATE
$4,750,000
SCOPE
This project will entail the reconstruction of Fairway Drive & Savell Drive. This will include the removal of the existing concrete roadway, establishing designed grades, subgrade stabilization and placing 7-inch concrete with 6-inch curbs, 5-foot-wide sidewalk, and driveways. Drainage improvements include the replacements of portions of the storm sewer system along with the replacement of existing in lets and adding additional inlets to the project. Replacement of the waterline on both streets including the removal and replacement of sections of the existing sanitary sewer system. https://www.civcastusa.com/project/61f9a8f4dc1e228b7f7b50c4/summary adrian.shimek@arkkengineers.com