(CMAR) Water Main Replacements Quarter Sections 55D 55B
BID DATE
05/26/22 - 11:00
AGENCY
Mesa
ESTIMATE
$5,500,000
SCOPE
SHORTLIST 4/4/22: The City of Mesa will construct a water main replacement project for City of Mesa Quarter Sections 55D and 55B. The residential water systems near Baseline and Gilbert Roads are nearly 50-years old and have reached the end of their service life. This project will install new 8-inch and 12-inch ductile iron pipe (DIP), valves, water services and fire hydrants and other incidental work as required. The existing system will be abandoned in place. Contractor will be responsible for installing new water mains, utility coordination, bacteria testing and flushing, water service connections on private property and traffic control. Coordination with the City and project phasing will also be required. stephanie.gishey@mesaaz.gov