Access the Full Project by Clicking here!
Bidjugde
JOB
First Street Resurfacing Phase 2
BID DATE
03/9/22 - 1:30
AGENCY
Lincoln
ESTIMATE
$1,210,000
SCOPE
The City of Lincoln has obtained Regional Surface Transportation Program (RSTP) funding. It plans to rehabilitate First Street from the alley between L Street and K Street to H Street during the 2022 construction season. The current conditions of this roadway are showing signs of pavement degradation, base failures, weathering, other pavement distress, drainage issues, and out-of-compliance ADA curb ramps. The proposed project will rehabilitate the roadway by performing full-depth reclamation with cement (FDR-C), correcting drainage issues by replacing sections of the existing curb and gutter, extending the underground storm drain system, and upgrading all non-compliant ADA ramps that cross the area of First Street being rehabilitated. In addition, new traffic striping and pavement markings will be placed. ENGRFP Dept 916-434-2419 edgar.garcia@lincolnca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT