Access the Full Project by Clicking here!
Bidjugde
JOB
Spinnaker Bay Drive Water Main Replacement Phase 1
BID DATE
03/3/22 - 4:00
AGENCY
Long Beach
ESTIMATE
$3,300,000
SCOPE
This work shall include but not limited to furnishing all labor, equipment and materials necessary for installation of new 6-inch/8-inch/12-inch polyvinyl chloride pipe, wax tape of ductile iron flanges, tape wrap and polyethylene wrapped ductile iron fittings, couplings, thrust blocks, valve anchors; installation of 6-inch/8-inch/12-inch gate valves; installation of 12-inch insertion valves; installation of 1-inch/2-inch water services, fire services and air relief valve assemblies; installation of fire hydrant assemblies; installation of 2-inch blow-off assemblies; connections to existing water mains; installation of PVC casing; relocation of existing sewer laterals; abandonment of existing water main, services, valves and fire hydrant laterals; removal and disposal of existing fire hydrant head and bury; appurtenant items such as traffic control, pavement removal and replacement, excavation, backfill and compaction, pressure testing and disinfection, and all other work necessary to complete this project complete in place. https://pbsystem.planetbids.com/portal/15810/bo/bo-detail/90318 wendy.chen@lbwater.org
PREBID
2/16/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT