Access the Full Project by Clicking here!
Bidjugde
JOB
East Blithedale Ave Rehab Phases 2 3
BID DATE
02/25/22 - 2:00
AGENCY
Mill Valley
ESTIMATE
$7,000,000
SCOPE
Roadway pavement rehabilitation and reconstruction, storm drain modifications, minor concrete work, replacement of curb, gutter and sidewalk, roadside signs, adjusting utility covers and boxes, relocating streetlights and electrical equipment, and installing solar-powered rectangular rapid flashing beacon (RRFB) systems. Roadway rehabilitation work will include mill and HMA overlay rehabilitation method and full depth pavement section reconstruction, including but not be limited to, pavement base repairs, HMA dig outs, pavement milling, saw cutting existing asphalt and concrete pavement, removal and off haul of underlying concrete pavement, placing and compacting aggregate base and asphalt concrete pavement, striping and pavement markings and curb ramp installation. The proposed scope of work for sewer rehabilitation on East Blithedale Avenue consists of repair and rehabilitation of existing sanitary sewer manholes. Open trench replacement of existing sanitary sewer mains and lateral connections. CURED-IN-PLACE PIPE (CIPP) aaaly@cityofmillvalley.org
UPDATES