Access the Full Project by Clicking here!
Bidjugde
JOB
East Main Street Sewer Replacement
BID DATE
02/23/22 - 11:00
AGENCY
Tremonton
ESTIMATE
n/a
SCOPE
The Project consists of constructing a new sewer main through a commercial parking lot, across the Malad River on an existing utility bridge, and within a UDOT right of way. This project will require open trench construction next to an existing sewer main line, transferring existing sewer services to new main line, re-shaping existing manhole flow lines, bypass pumping of existing sewer flows, sawcut and removal of existing asphalt, fabrication and installation of fittings and casing for sewer main to attach to existing utility bridge, plug and abandon old sewer main at various locations, new pavement in roadway and parking lot trenches, concrete sidewalk and curb restoration, and restoration of landscaping. zacb@jonescivil.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT