Main Street District MSD Water System Improvements
BID DATE
07/7/22 - 2:30
AGENCY
Truth Consequences
ESTIMATE
n/a
SCOPE
Project is to replace 23,600-feet of waterline in the Main Street District (MSD) of the City of Truth or Consequences with 6, 8, and 12-inch PVC waterline via open trench, pipe bursting, and horizontal directional drilling. All service connection will be replaced with new service lines, meter cans, and meters. Upgrades to the Cook Street Booster Station site to include gas chlorination system, VFD booster pumps with electrical, diesel generator, meter and chlorination injection vaults, SCADA system, and a 300,000- gallon steel ground water storage tank. daniela.ducon@wilsonco.com