Access the Full Project by Clicking here!
Bidjugde
JOB
South Central Streets Phase V
BID DATE
03/2/22 - 2:00
AGENCY
El Paso
ESTIMATE
n/a
SCOPE
Street, drainage, and landscape improvements are proposed for approximately 2200-feet of Edna Avenue from Alicia Drive to Huerta Drive. Construction improvements under this phase of construction include the demolition of concrete, pavement, curb, trees, adjustment to existing vehicular gates, and upgrade of existing street signage. Proposed street improvements will include excavation of roadway and drainage improvements, and the installation of 2” HMAC/8” Base Coarse/8” Select Fill; 6” standard curb and gutter; 4” rolled curb; 4” concrete sidewalk; 6” reinforced concrete driveway; speed table; ADA accessible ramps; and City Monuments. Roadway improvements will also include thermoplastic reflectorized pavement markings and new street sign assemblies. Landscape improvements include Rock mulch w/ weed fabric; minor grading; trees; of 5-gallon shrubs; 1-gallon shrubs; and irrigation system. Storm drainage improvements include concrete flumes; drop inlets; RCP pipe and manholes. Additionally, traffic and pedestrian control barricades, construction sequencing, and stormwater pollution prevention measures are required as part of this base bid Scope of Work. Pazcm@elpasotexas.gov http://legacy.elpasotexas.gov/purchasing/ep-invitation_detail.asp?control_number=2022-0401
PREBID
2/9/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT