Access the Full Project by Clicking here!
Bidjugde
JOB
Schuster Avenue Reconstruction
BID DATE
03/9/22 - 2:00
AGENCY
El Paso
ESTIMATE
n/a
SCOPE
Demolition: • Remove and properly dispose existing asphaltic and concrete pavement (regardless of depth), basecourse (regardless of depth), subgrade material, curb and gutter, sidewalks, driveways, ramps, miscellaneous concrete, abandonment ofexisting water and wastewater infrastructure, landscape, parkways, clearing and grubbing, traffic signs, light poles and pavement markings. Roadway Improvements: • HMAC and CRCP pavements, cement treated base course, flexible base course, suitable subgrade soils, standard curb and gutter, rolled curb, monolithic concrete curb, City monuments, ADA compliant sidewalks, ADA compliant wheelchair ramps, detectable warning panels, reinforced concrete driveways, landscape to include trees, shrubs and accents, decomposed granite surface, irrigation system, traffic signs, pavement markings and street lighting. The work will require establishing traffic and erosion control measures. http://legacy.elpasotexas.gov/purchasing/ep-invitation_detail.asp?control_number=2022-0398
UPDATES