Access the Full Project by Clicking here!
Bidjugde
JOB
Flight Test Apron Hill Air Force Base
BID DATE
03/10/22 - 1:00
AGENCY
Department Defense
ESTIMATE
n/a
SCOPE
Replace existing Portland cement concrete (PCC) slabs in sections A36B, A45Bl, A45B2, and A52B, along with full reconstruction of structural base materials to include the addition of a coarse aggregate base with a drainage and separation layer, as required for seasonal frost conditions. Demolition includes but is not limited to the removal of existing apron PCC slabs, and adjacent PCC drainage swale. The selected contractor will also provide anchored tie-downs and pavement markings on new apron. https://sam.gov/opp/7a40274e96654a51af52795611a26f00/view Primary Point of Contact Harold Teague harold.e.teague@usace.army.mil Secondary Point of Contact John Wysocki John.Wysocki@usace.army.mil