Access the Full Project by Clicking here!
Bidjugde
JOB
Blanche Street Water Improvements
BID DATE
02/15/22 - 2:30
AGENCY
Terrell
ESTIMATE
$550,000
SCOPE
The Project includes the relocation and upsizing of the water lines along North Blanche Street. These relocations are being performed in preparation for future storm drain improvements along North Blanche Street. There will be approximately 220 linear feet of 12-inch diameter water pipeline along Moore Avenue (US 80) near North Blanche Street, and approximately 722 linear feet of 8-inch diameter water pipeline along North Blanche street with approximately 46 LF of 8-inch diameter water pipeline lowering across North Blanche Street. Please direct all questions related to the design of this Project to the Q&A Section. https://www.civcastusa.com/project/61f01328eeabecfa718481f6/summary jsj@freese.com
PREBID
2/8/2022 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT