Access the Full Project by Clicking here!
Bidjugde
JOB
2022 CIPP Rehabilitation Project
BID DATE
04/19/22 - 4:00
AGENCY
South Valley Sewer District
ESTIMATE
n/a
SCOPE
PREQUAL 2/16/22: The WORK includes the following: • Installation of approximately 5,700-linear feet of Cured-in-Place Pipe (CIPP) within an existing 42-inch sewer trunk line between 13200 S and 12600 S, a portion of which is aligned through the Riverbend Golf Course • Installation of approximately 6,600-linear feet of Cured-in-Place Pipe (CIPP) within an existing 30-inch sewer trunk line running through the residential area west of Mulligans Golf Course between 10600 S and 10000 S • Installation of approximately 1,200-linear feet of Cured-in-Place Pipe (CIPP) within an existing 24-inch sewer trunk line located in 13200 S in Riverton • Installation of approximately 135-linear feet of Cured-in-Place Pipe (CIPP) within an existing 18-inch sewer line located in 11400 S • Reconnection of all active laterals. • Installation of approximately 55 Corrosion Resistant Manhole Liners • Installation and removal of temporary construction access roads • Construction of temporary bypass connections and bypass pipelines • Perform all necessary by-pass pumping and odor control needed to complete the project • Traffic Control permitting and execution during construction • Coordination with Riverbend Golf Course to limit closures to their course and driving Matthew Garn +1 801-617-1057 matthewg@svsewer.com
UPDATES