Access the Full Project by Clicking here!
Bidjugde
JOB
Abbott Road Lift Station 2 Construction
BID DATE
02/25/22 - 11:00
AGENCY
San Antonio
ESTIMATE
$1,500,000
SCOPE
The River Authority is seeking bids for Abbott Road Lift Station #2 Construction. The engineer’s estimate for the base bid, without alternates, for this project is $1,500,000. This project is the construction of Abbott Road Lift Station No. 2, which will roughly mirror the existing Abbott Road Lift Station located at the same property. The lift station will convey flow from an existing 15-inch gravity wastewater line and will pump the wastewater into an existing 8-inch force main located within the Abbott Road right-of-way. This lift station will convey approximately 1.1 MGD of flow. This work will also include the installation of air valves along the existing 8-inch force main The construction shall be accomplished per the solicitation documents and all exhibits and Attachments identified in the table of contents. Before submitting a bid, the bidder shall examine carefully the Bid, Plans, Specifications, General Conditions, Supplementary Conditions, Special Provisions, Addenda, Contract Forms and sites of the proposed work. He shall satisfy himself as to the character, quality and quantities of work to be performed and materials to be furnished. The submission of a bid by a bidder shall be conclusive evidence that he has complied with these requirements. Claims for additional compensation due to variation between conditions actually encountered in construction and as indicated by the plans will not be allowed. https://www.civcastusa.com/project/61f2c9f0f9bc7f120247b872/summary ksmith@sariverauthority.org
PREBID
2/4/2022 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT