Access the Full Project by Clicking here!
Bidjugde
JOB
Roosevelt Avenue I-10 to S St Marys Street
BID DATE
03/8/22 - 2:00
AGENCY
San Antonio
ESTIMATE
$4,053,000
SCOPE
The project includes the following corridor improvements and pedestrian enhancements along 0.5 miles: 3-lane roadway (two 11-foot travel lanes) with center turn lane (10-feet) 5-foot bike lanes on both sides of the street 6-foot sidewalks on both sides from UPRR Bridge to Steves Ave. Historic bridge restoration work will also include repair and upgrading illumination and structural components, as well as ADA compliance and connect Roosevelt North to the existing pedestrian amenities on Eagleland Dr. such as sidewalks and bike lanes. https://www.civcastusa.com/project/61f402e15ed087331e8ce10b/summary desiree.alderete@sanantonio.gov
UPDATES