Access the Full Project by Clicking here!
Bidjugde
JOB
CDBG CYR Center Park Parking Lot
BID DATE
02/22/22 - 1:00 LIVE!
AGENCY
Sierra Vista
ESTIMATE
$490,000
SCOPE
Construction of a new parking lot and shared use path (SUP) at Cyr Center Park north of Kayetan Dr. and West of North Ave. The new parking lot will be constructed of two inches (2”) of asphalt concrete over four inches (4”) of aggregate base course. Purchase and or install of Curb, sidewalk, conduit, striping, parking bumpers, sign installation, grading and fill, and a retention basin will be encompassed within this project scope. Both driveways to the parking lot will require installation of a single, steel corrugated metal pipe (CMP) to accommodate nuisance flows. Handrail and a retaining curb shall be installed on either side of the shared use path for a portion of the southern area of the project. https://secure.procurenow.com/portal/sierravistaaz/projects/15350 helen.lee@sierravistaaz.gov LIVE LINK: https://sierravista.webex.com/sierravista/j.php?MTID=m793f475fb5b5bd7b4bf334225d72248f
UPDATES