Bon Air Road Bridge Replacement (REBID)
BID DATE
01/30/18 - 2:00
AGENCY
Larkspur
ESTIMATE
$15,651,000
SCOPE
ORG BID RESULTS: MCM Construction - $26,831,623 Kiewit - CA - $29,800,000 The Project seeks to address structural deficiencies with the existing Bon Air Road Bridge by replacing the bridge. The existing bridge is a 420-foot long by 44-foot wide pile supported bridge with two car lanes, a bike path on the north side of the bridge, and a sidewalk on the south side of the bridge. The proposed new bridge will be a 388-foot long by 62.5-foot wide pile supported bridge with two car lanes, and bicycle lanes and sidewalks on both sides of the bridge. Rita Schoch publicworks@cityoflarkspur.org 415-927-5017