Yolo Bypass West Levee Culvert Replacement
BID DATE
02/15/22 - 2:00
AGENCY
Woodland
ESTIMATE
$2,500,000
SCOPE
The Project will replace three 48-inch culverts in the City’s Outfall Channel at the intersection with the Yolo Bypass West Levee with a single cast-in-place concrete box culvert with four bays. Cast-in-place concrete headwalls will be constructed at the inlet and outfall structures. The cast-in-place culvert will be approximately 115 feet long with four 6-foot by 6-foot bays. The individual bays will be fitted with flap gates at the outfall structure and will include a closure structure equipped with emergency isolation slide gates. A six-month construction period (May through October) is anticipated that includes cofferdam construction and dewatering, excavation and demolition, construction of the new culvert, reconstruction of the Yolo Bypass West Levee, and cleanup and restoration. In-channel work is restricted to June 1 through October 31. mark.miller@cityofwoodland.org https://cityofwoodland.org/bids.aspx?bidID=95 https://ciplist.com/plan/?Woodland/city/13872/plan/4264

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT