Access the Full Project by Clicking here!
Bidjugde
JOB
12 16 Water Line Relocation Along Old Richmond Road
BID DATE
02/4/22 - 3:00
AGENCY
Kingsbridge MUD
ESTIMATE
$435,000
SCOPE
Project consists of removal of approx. 2,620 linear feet of 12" and 16" water lines, valves and fire hydrants; construction of approx. 2,170 linear feet of 12" PVC C-900 water line and 430 linear feet of 16" PVC C-900 water line, gate valves, fire hydrants, ductile iron fittings; trench safety system; traffic control during construction; sediment controls and flexible pavement street cut repairs for water line adjustments; regrading of roadside ditch, and hydromulch seeding of disturbed areas. https://www.civcastusa.com/project/61ef186b799a5fa841bd6709/summary david.miller@miller-and-associates.com
PREBID
1/28/2022 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT