Access the Full Project by Clicking here!
Bidjugde
JOB
Air Cargo Way Lift Station Relocation
BID DATE
02/24/22 - 2:00
AGENCY
Reno Airport
ESTIMATE
$580,000
SCOPE
In general, the project will include a new duplex lift station located within the shoulder of Air Cargo Way, consisting of a new wet well and external valve vault. A new bypass manhole will be installed upstream (south) of the existing lift station, and a new discharge manhole will be installed downstream (north) of the existing lift station. The proposed configuration will enable the existing lift station to remain in operation during construction. Upon completion of the new lift station, the existing facility will be demolished, and the existing piping in between will be removed and/or abandoned. The project will also include a new bypass pumping connection within the shoulder of the roadway, and new electrical controls / SCADA panels in a new equipment enclosure at the edge of the shoulder. A new backup power supply diesel generator will also be installed to enable the system to remain in operation in the event of a power outage. A new security fence with gates and driveway access will be also installed for access and security at the facility. dmeehan@renoairport.com lwilliams@renoairport.com
PREBID
2/9/2022 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT